BoxPower gives C&I customers a path to electrify now, protect operations, control energy costs, and meet sustainability commitments without waiting for the grid to catch up. Bridge to interconnection, ride through outages, or connect under an operating envelope, all while saving money on demand charges and earning additional revenue from grid services programs in your jurisdiction. Design it, deploy it, and operate it under one contract and one point of accountability, so there’s no finger-pointing between vendors when the power matters.
Electrify operations without waiting years for feeder upgrades. BoxPower gives you a path to charge now and scale into grid-connected operations later.
Secure power when speed and reliability are both non-negotiable. Bridging and flexible interconnection provide smaller-scale, cleaner, faster alternatives to large gas bridge solutions at 5-20 MW scale, where utility interconnect timelines are 3-5 years.
For cold storage, semiconductor fabs, pharma, and paper operations, an hour of process downtime can cost $50K–$500K. BoxPower delivers integrated backup and bridging infrastructure sized for continuous-process facilities.
BoxPower's solar+battery microgrid gives MCHC Health Clinic a predictable energy cost instead of a rising one, saving over $85,000 a year in utility costs. The same system keeps critical services running through frequent PSPS events.
Andalusia Country Club's luxury home development faced a 3–5-year grid connection wait, the same timeline problem stalling C&I expansion across the United States. BoxPower engineered the bridging system, with construction currently underway. The system will transition to grid-interactive operation when interconnection completes.