What You're Facing

Continuity Isn't Optional

icon
Critical emergency services, water systems, and healthcare infrastructure cannot tolerate outages measured in hours, let alone days
icon
Aging grid infrastructure and increasing weather-related disruption create unacceptable risk for mission-critical operations
icon
Diesel backup is a liability: vulnerable fuel supply chains, high maintenance overhead on constrained budgets, and finite runtime
icon
Energy security mandates requiring long-term infrastructure, not stopgaps — delivered on federal procurement terms
BoxPower Helps

The Procurement Structure Critical Infrastructure Requires

BoxPower provides government agencies and critical-infrastructure operators with permanent, infrastructure-grade distributed power. Partner with a single accountable party through design, deployment, and operation for guaranteed 99.99%+ uptime across our SLA fleet, with 24/7 remote monitoring and fleet-level O&M that keep systems running without on-site staffing. We understand federal procurement (DOE ERA, USDA REAP/RUS, FEOC compliance) and design systems that satisfy it.

Backup Resilience

Ride through PSPS and multi-day outages with backup engineered as permanent infrastructure.

Keep water, health, and emergency services running through outages measured in days, not hours.

Islands automatically when the grid drops: emergency services, water, and health infrastructure that ride through multi-day outages.

Ride through PSPS and multi-day outages with backup engineered as permanent infrastructure.

Learn More
Remote Power

Retire the economics of your worst circuits with standalone systems instead of high-risk lines, at a fraction of the cost to harden.

Permanent, community-serving primary power for lands the grid never reached, with a decade of tribal deployments behind it.

Permanent primary power for facilities beyond the grid; a decade of deployments in the country's hardest environments.

Learn More
Bridging

Build now, connect later: permanent onsite power that carries your facility to interconnection, then keeps working after it.

Power new housing and community facilities now, and connect on your timeline.

Open new facilities and electrify public fleets on schedule: permanent power that runs ahead of interconnection and keeps serving after it.

One system for both sides of the queue: operate now, then transition to a grid-interactive asset when interconnection completes.

Build now, connect later: permanent onsite power that carries your facility to interconnection, then keeps working after it.

Learn More
No items found.

Critical Services Continuity That Held Through PSPS

During frequent PSPS events, critical health services faced extended outages with no viable backup. BoxPower's solar + battery microgrid keeps operations running, avoids lost revenue and spoiled medications during outages, and saves MCHC over $85,000/year in utility costs. The system continues to operate as a permanent infrastructure asset.

BoxPower Sun decoration