What It Is

Know If It's Buildable, and What It Costs, In Minutes

EASI translates constrained grid needs into a procurable, pre-engineered hardware package and architecture recommendation, with a fully broken-out preliminary installed cost estimate backed by BoxPower. Planners cut months from project timelines otherwise spent looking for a partner to build within those guidelines.

Lifetime Maintenance icon

Site feasibility assessment

solar power icon

Technoeconomic optimization of hybrid generation DER systems

Strategic Program Development

Complete performance characteristics

Solar production curves, BESS state-of-charge profiles, generator usage and fuel consumption, LCOE

cost icon

Detailed preliminary total installed cost estimate

PPA Providers icon

Site layout and single line diagram

EASI Project Overview Screenshot
EASI Turnkey Cost Screenshot
EASI Project Cost Screenshot
EASI Premium

Qualified Partners Go Deeper with Dedicated Support

EASI’s premium tier offers concierge training, design review, and engineering support to streamline multi-site analysis.

icon

Dedicated partner manager

icon

Up to 20 hours of BoxPower engineering consultation yearly

icon

Customizable upon request: new features, utility rates, hardware kit configurations

Demo
Watch EASI Design and Price in Minutes
EASI Steps
From project requirements to microgrid design in three clicks
1

Create Your Project

Enter site location and load details. Choose off-grid or grid-tied. Upload meter data, build from appliances, or describe your load in plain language and let AI generate it.

2

Optimize

One click runs a full techno-economic optimization, generating optimal PV, battery, and generator sizing with dispatch strategy and financial analysis.

3

Select a Kit and Propose

EASI matches your results to a safe, reliable, and pre-engineered BoxPower hardware kit. Review the BOM, finalize pricing, and export a proposal.

Sizing the Path to Faster Tribal Housing Expansion

At a Tribal housing development site where traditional interconnection would require a full feeder upgrade, EASI modeled and sized a 400 kW / 1.3 MWh battery storage system as a faster, lower-cost alternative. The output included a preliminary installed cost estimate, allowing the project to move smoothly from concept to a fundable, buildable path forward.

BoxPower Sun decoration

Ready to Solve Your Grid Constraint?