What You're Facing

Remote, Underserved, and Paying for It in Diesel

icon
Remote locations where extending grid service is economically unfeasible
icon
Dependence on diesel generators brings high fuel costs, supply chain risks, environmental impact
icon
Critical infrastructure (water, health, emergency services) requires power that can't fail
icon
Funding programs favor shovel-ready applications with feasibility and preliminary engineering already complete, but that design work costs money many communities must first win a separate grant to fund
BoxPower Helps

Systems Designed for Energy Sovereignty

BoxPower builds systems tribes own and control as permanent infrastructure. Our history of deploying permanent, high-reliability microgrids for tribal partners gives us experience that generic solar installers don't have. We design systems for the long-haul.

Remote Power

Retire the economics of your worst circuits with standalone systems instead of high-risk lines, at a fraction of the cost to harden.

Permanent, community-serving primary power for lands the grid never reached, with a decade of tribal deployments behind it.

Permanent primary power for facilities beyond the grid; a decade of deployments in the country's hardest environments.

Learn More
Backup Resilience

Ride through PSPS and multi-day outages with backup engineered as permanent infrastructure.

Learn More
Bridging

Build now, connect later: permanent onsite power that carries your facility to interconnection, then keeps working after it.

Learn More

A Decade of Grant and Tribal Partnership Experience

icon
Grant-Ready Before You Spend a Dollar

Most funding programs require, or score higher with, projects that arrive already engineered. For communities without capital to fund design work, that's a grant needed to qualify for the grant. EASI closes the gap: single-line diagrams, equipment layouts, bill of materials, installation scope, and a detailed preliminary installed cost estimate. Run feasibility and preliminary engineering for your site without spending capital you haven't been awarded yet. Your application arrives pre-engineered and when the award comes through, BoxPower's engineers carry the same package straight into detailed design.

icon
Long-Standing Tribal Partnerships

A decade of building alongside tribal nations, tribal utilities, and Alaska Native communities; from the Hopi Utilities Corporation in Arizona to communities served with the Northwest Arctic Native Association and the Tanana Chiefs Conference in Alaska.

No items found.